Driveways & Paving in Leeds
Build the base.Lay the drive on it.
We break out the old drive and compact a stone sub-base. The edges go in next, then the blocks or the resin.
Front drive: cracked concrete to charcoal blocks. Move across the photo to compare.Photos and video on this site are illustrative.
02How we work
Most of a drive is underground. We spend our time on the dig and the sub-base, because the surface only stays level if they do.
- DrivesBlocks, resin, tarmac and gravel
- PatiosSandstone and porcelain on full beds
- PathsSetts, steps and firm edges
03By type of work
Pick a surface.
Block paving up to metal gatesPhotos and video on this site are illustrative.Driveway with drainage channelCharcoal blocks, pale border Resin-bound drivewayPhotos and video on this site are illustrative.Tarmac with block edgingGravel driveway Indian sandstone patioPhotos and video on this site are illustrative.Patio circle featurePorcelain patio Sandstone garden stepsPhotos and video on this site are illustrative.Setts path through the lawnGranite setts border 
01Block drives laid on a compacted stone sub-base inside solid edges. Once the blocks are down, sand is brushed into every joint.
Read more - Taking up and removing the old drive
- Digging out to firm ground
- Compacted crushed stone sub-base
- Edging set on concrete and haunched

02Resin and tarmac drives, and loose gravel. Each handles rain in its own way, so we go through which one fits your drive and how you use it.
Read more - Resin-bound stone trowelled over a suitable base
- Tarmac laid hot in two layers and rolled
- Gravel over a compacted base, with a membrane
- Stabilising grids to hold gravel in place

03Patios in stone or porcelain, bedded on mortar over a compacted sub-base. Levels sit below the damp-proof course and fall away from the house.
Read more - Taking up and removing an old patio
- Digging out and a compacted stone sub-base
- Indian sandstone or outdoor porcelain
- Slabs on a full bed of mortar

04Garden paths in blocks or slabs, held by firm edges. Steps sit on a prepared base, with every rise set to the same height.
Read more - Paths in setts, blocks or slabs
- Curved routes marked out first
- Firm edges and sett borders
- Compacted base under every path
05Before you hire anyone
Six questions to ask any driveway firm.
Ask us, ask anyone else, and compare the answers. Most of what you pay for ends up out of sight.
Ask us - 01
How deep will you dig?
The depth depends on the ground and what drives on it. Ask what happens if soft ground turns up.
- 02
What’s the sub-base?
The quote should name the stone, how thick it goes and how it gets compacted.
- 03
Where does the rain go?
Ask about the falls and any channels, and whether the water ends in a drain or a soakaway.
- 04
Do I need planning?
On a front garden it can depend on the size and the drainage. Check with your council.
- 05
What about the kerb?
Lowering a kerb is the council’s decision. Ask who applies and who may do the work.
- 06
What’s left out?
Moving covers, rebuilding walls and relaying turf are common extras. Find out before you agree.
06Before and after
Same drive. Same angle.
Break outCracked concrete broken up and dug out.
Build upCrushed stone spread, pale edging set around it.
Lay blocksCharcoal blocks going down, row by row.
Hand overLast blocks in, the drive swept clean.
00%
07The method
Four steps, on every job.
- 01
We see the job
We walk round with you, check the levels and access, and talk through surfaces and where the rain should go.
- 02
You get it in writing
A quote listing the dig, the layers, the edging and the drainage, so you can compare it with any other.
- 03
We dig and build up
Old surface out, edges set, crushed stone laid in layers and compacted. Most of the time goes here.
- 04
We lay and hand over
The surface goes down and the joints get finished. We tell you when it’s ready, then walk it with you.
Written quote
Tell us about the job.