Clientee AI, s.r.o.Driveways & Paving

Driveways & Paving in Leeds

Build the base.Lay the drive on it.

We break out the old drive and compact a stone sub-base. The edges go in next, then the blocks or the resin.

Front drive with its new surface: Cracked concrete to charcoal blocks
Front drive before the work
Front drive: cracked concrete to charcoal blocks. Move across the photo to compare.Photos and video on this site are illustrative.

02How we work

Most of a drive is underground. We spend our time on the dig and the sub-base, because the surface only stays level if they do.

  • DrivesBlocks, resin, tarmac and gravel
  • PatiosSandstone and porcelain on full beds
  • PathsSetts, steps and firm edges

03By type of work

Pick a surface.

Block-paved drive in mixed red and grey running up to black metal gates
Block paving up to metal gatesPhotos and video on this site are illustrative.
Block-paved driveway in front of a garage with a drainage channel along the door
Driveway with drainage channel
Charcoal block-paved driveway with a pale border in front of a semi-detached house
Charcoal blocks, pale border
01

Block paving

Block drives laid on a compacted stone sub-base inside solid edges. Once the blocks are down, sand is brushed into every joint.

Read more
  • Taking up and removing the old drive
  • Digging out to firm ground
  • Compacted crushed stone sub-base
  • Edging set on concrete and haunched
02

Resin, tarmac & gravel

Resin and tarmac drives, and loose gravel. Each handles rain in its own way, so we go through which one fits your drive and how you use it.

Read more
  • Resin-bound stone trowelled over a suitable base
  • Tarmac laid hot in two layers and rolled
  • Gravel over a compacted base, with a membrane
  • Stabilising grids to hold gravel in place
03

Patios

Patios in stone or porcelain, bedded on mortar over a compacted sub-base. Levels sit below the damp-proof course and fall away from the house.

Read more
  • Taking up and removing an old patio
  • Digging out and a compacted stone sub-base
  • Indian sandstone or outdoor porcelain
  • Slabs on a full bed of mortar
04

Paths & steps

Garden paths in blocks or slabs, held by firm edges. Steps sit on a prepared base, with every rise set to the same height.

Read more
  • Paths in setts, blocks or slabs
  • Curved routes marked out first
  • Firm edges and sett borders
  • Compacted base under every path

05Before you hire anyone

Six questions to ask any driveway firm.

Ask us, ask anyone else, and compare the answers. Most of what you pay for ends up out of sight.

Ask us
  1. 01

    How deep will you dig?

    The depth depends on the ground and what drives on it. Ask what happens if soft ground turns up.

  2. 02

    What’s the sub-base?

    The quote should name the stone, how thick it goes and how it gets compacted.

  3. 03

    Where does the rain go?

    Ask about the falls and any channels, and whether the water ends in a drain or a soakaway.

  4. 04

    Do I need planning?

    On a front garden it can depend on the size and the drainage. Check with your council.

  5. 05

    What about the kerb?

    Lowering a kerb is the council’s decision. Ask who applies and who may do the work.

  6. 06

    What’s left out?

    Moving covers, rebuilding walls and relaying turf are common extras. Find out before you agree.

06Before and after

Same drive. Same angle.

Drive from the pavement with its new surface: Broken concrete to block paving
Drive from the pavement before the work
See the gallery

Photos and video on this site are illustrative.

Break outCracked concrete broken up and dug out.

07The method

Four steps, on every job.

  1. 01

    We see the job

    We walk round with you, check the levels and access, and talk through surfaces and where the rain should go.

  2. 02

    You get it in writing

    A quote listing the dig, the layers, the edging and the drainage, so you can compare it with any other.

  3. 03

    We dig and build up

    Old surface out, edges set, crushed stone laid in layers and compacted. Most of the time goes here.

  4. 04

    We lay and hand over

    The surface goes down and the joints get finished. We tell you when it’s ready, then walk it with you.

Written quote

Tell us about the job.

Call Petr

07007 012345

Step 1 of 3

What would you like done?

Choose as many as apply.

What kind of property?

Where and when?

When would you like it done?

How can we reach you?
Call PetrGet a quote